Follow
maurizio faccio
maurizio faccio
Department of Management and Engineering, University of Padua, Italy
Verified email at unipd.it
Title
Cited by
Cited by
Year
Human–robot collaboration in manufacturing applications: A review
E Matheson, R Minto, EGG Zampieri, M Faccio, G Rosati
Robotics 8 (4), 100, 2019
4492019
New methodological framework to improve productivity and ergonomics in assembly system design
D Battini, M Faccio, A Persona, F Sgarbossa
International Journal of industrial ergonomics 41 (1), 30-42, 2011
3392011
Waste collection multi objective model with real time traceability data
M Faccio, A Persona, G Zanin
Waste management 31 (12), 2391-2405, 2011
3362011
Assembly system design in the Industry 4.0 era: a general framework
M Bortolini, E Ferrari, M Gamberi, F Pilati, M Faccio
Ifac-Papersonline 50 (1), 5700-5705, 2017
3172017
Fresh food sustainable distribution: cost, delivery time and carbon footprint three-objective optimization
M Bortolini, M Faccio, E Ferrari, M Gamberi, F Pilati
Journal of Food Engineering 174, 56-67, 2016
2162016
Design and management of digital manufacturing and assembly systems in the Industry 4.0 era
Y Cohen, M Faccio, F Pilati, X Yao
The International Journal of Advanced Manufacturing Technology 105, 3565-3577, 2019
1592019
Design of the optimal feeding policy in an assembly system
D Battini, M Faccio, A Persona, F Sgarbossa
International Journal of Production Economics 121 (1), 233-254, 2009
1582009
Motion Analysis System (MAS) for production and ergonomics assessment in the manufacturing processes
M Bortolini, M Faccio, M Gamberi, F Pilati
Computers & Industrial Engineering 139, 105485, 2020
1572020
Industrial maintenance policy development: A quantitative framework
M Faccio, A Persona, F Sgarbossa, G Zanin
International Journal of Production Economics 147, 85-93, 2014
1532014
Assembly system configuration through Industry 4.0 principles: the expected change in the actual paradigms
Y Cohen, M Faccio, FG Galizia, C Mora, F Pilati
IFAC-PapersOnLine 50 (1), 14958-14963, 2017
1202017
Collaborative and traditional robotic assembly: a comparison model
M Faccio, M Bottin, G Rosati
The International Journal of Advanced Manufacturing Technology 102, 1355-1372, 2019
1002019
Inventory holding costs measurement: a multi-case study
A Azzi, D Battini, M Faccio, A Persona, F Sgarbossa
The International Journal of Logistics Management 25 (1), 109-132, 2014
1002014
“Supermarket warehouses”: stocking policies optimization in an assembly-to-order environment
D Battini, M Faccio, A Persona, F Sgarbossa
The International Journal of Advanced Manufacturing Technology 50, 775-788, 2010
902010
Consignment stock inventory model in an integrated supply chain
D Battini, A Gunasekaran, M Faccio, A Persona, F Sgarbossa
International Journal of Production Research 48 (2), 477-500, 2010
902010
Design configuration for a mixed-model assembly system in case of low product demand
D Battini, M Faccio, E Ferrari, A Persona, F Sgarbossa
The International Journal of Advanced Manufacturing Technology 34, 188-200, 2007
892007
The impact of production mix variations and models varieties on the parts-feeding policy selection in a JIT assembly system
M Faccio
The International Journal of Advanced Manufacturing Technology 72, 543-560, 2014
862014
Balancing–sequencing procedure for a mixed model assembly system in case of finite buffer capacity
D Battini, M Faccio, A Persona, F Sgarbossa
The International Journal of Advanced Manufacturing Technology 44, 345-359, 2009
842009
Deploying cobots in collaborative systems: major considerations and productivity analysis
Y Cohen, S Shoval, M Faccio, R Minto
International Journal of Production Research 60 (6), 1815-1831, 2022
832022
Kanban number optimisation in a supermarket warehouse feeding a mixed-model assembly system
M Faccio, M Gamberi, A Persona
International Journal of Production Research 51 (10), 2997-3017, 2013
832013
Fully flexible assembly systems (F‐FAS): a new concept in flexible automation
G Rosati, M Faccio, A Carli, A Rossi
Assembly Automation 33 (1), 8-21, 2013
822013
The system can't perform the operation now. Try again later.
Articles 1–20