Desmond Eseoghene Ighravwe
Desmond Eseoghene Ighravwe
Bells University of Technology, Ota, Nigeria
Verified email at bellsuniversity.edu.ng
Title
Cited by
Cited by
Year
A non-zero integer non-linear programming model for maintenance workforce sizing
DE Ighravwe, SA Oke
International Journal of Production Economics 150, 204-214, 2014
392014
A multi-criteria decision-making framework for selecting a suitable maintenance strategy for public buildings using sustainability criteria
DE Ighravwe, SA Oke
Journal of Building Engineering 24, 100753, 2019
292019
Predicting performance measures using linear regression and neural network: A comparison
CO Anyaeche, DE Ighravwe
African Journal of Engineering Research 1 (3), 84-89, 2013
222013
Ranking maintenance strategies for sustainable maintenance plan in manufacturing systems using fuzzy axiomatic design principle and fuzzy-TOPSIS
DE Ighravwe, SA Oke
Journal of Manufacturing Technology Management, 2017
202017
Selection of a mini-grid business model for developing countries using CRITIC-TOPSIS with interval type-2 fuzzy sets
D Ighravwe, M Babatunde
Decision Science Letters 7 (4), 427-442, 2018
172018
A fuzzy-grey-weighted aggregate sum product assessment methodical approach for multi-criteria analysis of maintenance performance systems
DE Ighravwe, SA Oke
International Journal of System Assurance Engineering and Management 8 (2 …, 2017
132017
A reliability-based maintenance technicians’ workloads optimisation model with stochastic consideration
DE Ighravwe, SA Oke, KA Adebiyi
Journal of Industrial Engineering International 12 (2), 171-183, 2016
102016
Evaluation and selection of hybrid renewable energy systems for healthcare centres in rural areas: a techno-economic approach
DE Ighravwe, B OM, OS Adedoja, TE Okharedia
2018 IEEE 7th International Conference on Adaptive Science & Technology …, 2018
92018
A multi-hierarchical framework for ranking maintenance sustainability strategies using PROMETHEE and fuzzy entropy methods
DE Ighravwe, SA Oke
Journal of Building Pathology and Rehabilitation 2 (1), 9, 2017
92017
Maintenance workload optimisation with accident occurrence considerations and absenteeism from work using a genetic algorithm
DE Ighravwe, SA Oke, KA Adebiyi
International Journal of Management Science and Engineering Management 11 (4 …, 2016
92016
Determination of a suitable renewable energy source for mini-grid business: A risk-based multicriteria approach
DE Ighravwe, MO Babatunde
Journal of Renewable Energy 2018, 2018
82018
A CRITIC-TOPSIS framework for hybrid renewable energy systems evaluation under techno-economic requirements
M Babatunde, D Ighravwe
Journal of Project Management 4 (2), 109-126, 2019
72019
Urban water demand forecasting: A comparative evaluation of conventional and soft computing techniques
O Oyebode, DE Ighravwe
Resources 8 (3), 156, 2019
62019
Evaluation of solar PV microgrid deployment Sustainability in Rural Areas: A fuzzy STEEP Approach
D Akinyele, L Olatomiwa, D Ighravwe, O Babatunde, C Monyei, A Onile
2019 IEEE PES/IAS PowerAfrica, 593-598, 2019
62019
A multi-attribute framework for determining the competitive advantages of products using grey-TOPSIS cum fuzzy-logic approach
DE Ighravwe, SA Oke
Total Quality Management & Business Excellence 29 (7-8), 762-785, 2018
62018
Sustenance of zero-loss on production lines using Kobetsu Kaizen of TPM with hybrid models
DE Ighravwe, SA Oke
Total Quality Management & Business Excellence 31 (1-2), 112-136, 2020
52020
Possibility of solar thermal power generation technologies in Nigeria: Challenges and policy directions
D Akinyele, O Babatunde, C Monyei, L Olatomiwa, A Okediji, D Ighravwe, ...
Renewable Energy Focus 29, 24-41, 2019
52019
Evaluation of landfill gas plant siting problem: a multi-criteria approach
DE Ighravwe, DE Babatunde
Environmental Health Engineering and Management Journal 6 (1), 1-10, 2019
52019
An enhanced reliability-oriented workforce planning model for process industry using combined fuzzy goal programming and differential evolution approach
DE Ighravwe, SA Oke, KA Adebiyi
Journal of Industrial Engineering International 14 (1), 185-212, 2018
52018
A fuzzy-TOPSIS approach for techno-economic viability of lighting energy efficiency measure in public building projects
K Abdulsalam, D Ighravwe, M Babatunde
Journal of Project Management 3 (4), 197-206, 2018
52018
The system can't perform the operation now. Try again later.
Articles 1–20