Follow
Jun-Qiang WANG (王军强)
Jun-Qiang WANG (王军强)
Other namesJunqiang Wang, J. Q. Wang, Jun-Qiang WANG
Northwestern Polytechnical University (NPU) 西北工业大学
Verified email at nwpu.edu.cn - Homepage
Title
Cited by
Cited by
Year
Real-time information capturing and integration framework of the internet of manufacturing things
Y Zhang, G Zhang, J Wang, S Sun, S Si, T Yang
International Journal of Computer Integrated Manufacturing 28 (8), 811-822, 2015
3142015
数字孪生及其应用探索
陶飞, 刘蔚然, 刘检华, 刘晓军, 刘强, 屈挺, 胡天亮, 张执南, 向峰, ...
计算机集成制造系统 24 (第 1), 1, 2018
1942018
An optimization method for shopfloor material handling based on real-time and multi-source manufacturing data
Y Zhang, G Zhang, W Du, J Wang, E Ali, S Sun
International Journal of Production Economics 165, 282-292, 2015
1032015
一种基于物联技术的制造执行系统实现方法与关键技术
张映锋, 赵曦滨, 孙树栋, 王军强, 司书宾
计算机集成制造系统 18 (012), 2634-2642, 2012
78*2012
A cooperative approach to service booking and scheduling in cloud manufacturing
J Chen, GQ Huang, JQ Wang, C Yang
European Journal of Operational Research 273 (3), 861-873, 2019
712019
Theory of constraints product mix optimisation based on immune algorithm
JQ Wang, SD Sun, SB Si, HA Yang
International Journal of Production Research 47 (16), 4521-4543, 2009
672009
Synchronisation of production scheduling and shipment in an assembly flowshop
J Chen, GQ Huang, H Luo, J Wang
International Journal of Production Research 53 (9), 2787-2802, 2015
582015
Scheduling jobs with equal-processing-time on parallel machines with non-identical capacities to minimize makespan
JQ Wang, JYT Leung
International Journal of Production Economics 156, 325-331, 2014
432014
集成化生产计划管理与控制模型
王军强, 孙树栋, 余建军, 孙强
计算机集成制造系统 11 (009), 1223-1228, 2005
362005
Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes
JQ Wang, GQ Fan, Y Zhang, CW Zhang, JYT Leung
European Journal of Operational Research 258 (2), 478-490, 2017
352017
组件化和集成化车间生产管理系统的研究与实现
王军强, 孙树栋, 司书宾, 褚崴, 于晓义
计算机集成制造系统 12 (2), 231-239, 2006
33*2006
基于正交试验的作业车间瓶颈识别方法
翟颖妮, 孙树栋, 王军强, 王萌
计算机集成制造系统 16 (09), 0, 2010
32*2010
Schedule-based execution bottleneck identification in a job shop
JQ Wang, J Chen, Y Zhang, GQ Huang
Computers & Industrial Engineering 98, 308-322, 2016
312016
The TOC-based algorithm for solving multiple constraint resources: A re-examination
JQ Wang, ZT Zhang, J Chen, YZ Guo, S Wang, SD Sun, T Qu, GQ Huang
IEEE Transactions on Engineering Management 61 (1), 138-146, 2013
312013
基于组件的设备管理信息系统的研究与实现
王军强, 孙树栋, 柴永生, 司书宾
计算机集成制造系统 10 (9), 1095-1099, 2004
28*2004
Job shop bottleneck detection based on orthogonal experiment
Y Zhai, S Sun, J Wang, G Niu
Computers & Industrial Engineering 61 (3), 872-880, 2011
262011
基于约束理论的制造单元管理与控制研究
王军强, 孙树栋, 王东成, 杨宏安
计算机集成制造系统 12 (07), 0, 2006
26*2006
MRPⅡ, JIT, TOC 生产计划与控制比较研究
王军强, 张翠林, 孙树栋, 付平
制造业自动化 27 (2), 9-13, 2005
262005
Research on initiative scheduling mode for a physical internet-based manufacturing system
J Wang, G Fan, F Yan, Y Zhang, S Sun
The International Journal of Advanced Manufacturing Technology 84, 47-58, 2016
242016
Two decompositions for the bicriteria job-shop scheduling problem with discretely controllable processing times
G Niu, S Sun, P Lafon, Y Zhang, J Wang
International Journal of Production Research 50 (24), 7415-7427, 2012
212012
The system can't perform the operation now. Try again later.
Articles 1–20