Follow
Mounir El Asmar, Ph.D.
Title
Cited by
Cited by
Year
Quantifying performance for the integrated project delivery system as compared to established delivery systems
M El Asmar, AS Hanna, WY Loh
Journal of construction engineering and management 139 (11), 04013012, 2013
3932013
Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost …
J Sullivan, ME Asmar, J Chalhoub, H Obeid
Journal of construction engineering and management 143 (6), 04017009, 2017
1512017
Evaluating integrated project delivery using the project quarterback rating
M El Asmar, AS Hanna, WY Loh
Journal of Construction Engineering and Management 142 (1), 04015046, 2016
1442016
State of practice of building information modeling in mechanical and electrical construction industries
A Hanna, F Boodai, M El Asmar
Journal of Construction Engineering and Management 139 (10), 04013009, 2013
1122013
Simulation-aided occupant-centric building design: A critical review of tools, methods, and applications
E Azar, W O'Brien, S Carlucci, T Hong, A Sonta, J Kim, MS Andargie, ...
Energy and Buildings 224, 110292, 2020
982020
Energy Consumption Evaluation of U.S. Navy Leed-Certified Buildings
C Menassa, S Mangasarian, M El Asmar, C Kirar
Journal of Performance of Constructed Facilities 26 (1), 46, 2012
952012
Analyzing Arizona OSHA injury reports using unsupervised machine learning
A Chokor, H Naganathan, WK Chong, M El Asmar
Procedia engineering 145, 1588-1593, 2016
782016
Are building occupants satisfied with indoor environmental quality of higher education facilities?
M El Asmar, A Chokor, I Srour
Energy procedia 50, 751-760, 2014
622014
A New Approach to Developing Conceptual Cost Estimates for Highway Projects
M El Asmar, AS Hanna, G Whited
Journal of Construction Engineering and Management 1, 251, 2011
552011
Quantitative Methods for Design-Build Team Selection
M El Asmar, W Lotfallah, G Whited, AS Hanna
Journal of Construction Engineering and Management 136, 904, 2010
532010
Integrated project delivery as an enabler for collaboration: a Middle East perspective
F Hamzeh, F Rached, Y Hraoui, AJ Karam, Z Malaeb, M El Asmar, ...
Built Environment Project and Asset Management 9 (3), 334-347, 2019
442019
MARS: Metaframework for assessing ratings of sustainability for buildings and infrastructure
D Papajohn, C Brinker, M El Asmar
Journal of Management in Engineering 33 (1), 04016026, 2017
422017
Project quality and change performance differences associated with the use of building information modeling in design and construction projects: Univariate and multivariate …
TC Francom, M El Asmar
Journal of Construction Engineering and Management 141 (9), 04015028, 2015
422015
Improving project performance through partnering and emotional intelligence
ME Cacamis, M El Asmar
Practice Periodical on Structural Design and Construction 19 (1), 50-56, 2014
392014
Performance analysis of construction manager at risk on pipeline engineering and construction projects
T Francom, M El Asmar, ST Ariaratnam
Journal of Management in Engineering 32 (6), 04016016, 2016
382016
Monte Carlo Simulation Approach to Support Alliance Team Selection
M El Asmar, AS Hanna, CK Chang
Journal of Construction Engineering and Management 135, 1087, 2009
382009
DB 2020: Analyzing and forecasting design-build market trends
H Vashani, J Sullivan, M El Asmar
Journal of Construction Engineering and Management 142 (6), 04016008, 2016
362016
A meta-analysis of literature comparing project performance between design-build (DB) and design-bid-build (DBB) delivery systems
V Nikou Goftar, M El Asmar, E Bingham
Construction Research Congress 2014: Construction in a Global Network, 1389-1398, 2014
292014
Mathematical formulation of the project quarterback rating: New framework to assess construction project performance
AS Hanna, W Lotfallah, DG Aoun, ME Asmar
Journal of Construction Engineering and Management 140 (8), 04014033, 2014
282014
Quantitative performance assessment of single-step versus two-step design-build procurement
D Ramsey, M El Asmar, GE Gibson Jr
Journal of Construction Engineering and Management 142 (9), 04016033, 2016
262016
The system can't perform the operation now. Try again later.
Articles 1–20