Follow
Gunnar Lucko
Gunnar Lucko
Professor of Civil Engineering, Catholic University of America
Verified email at cua.edu - Homepage
Title
Cited by
Cited by
Year
Research validation: Challenges and opportunities in the construction domain
G Lucko, EM Rojas
Journal of Construction Engineering and Management 136 (1), 127-135, 2009
3232009
Cranes for building construction projects
A Shapira, G Lucko, CJ Schexnayder
Journal of Construction Engineering and Management 133 (9), 690-700, 2007
1222007
Productivity scheduling method: Linear schedule analysis with singularity functions
G Lucko
Journal of Construction Engineering and Management 135 (4), 246-253, 2009
782009
Productivity scheduling method compared to linear and repetitive project scheduling methods
G Lucko
Journal of Construction Engineering and Management 134 (9), 711-720, 2008
662008
Integrating efficient resource optimization and linear schedule analysis with singularity functions
G Lucko
Journal of Construction Engineering and Management 137 (1), 45-55, 2010
612010
Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions
Y Su, G Lucko
Automation in Construction 70, 38-50, 2016
592016
Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling
G Lucko, TDCL Alves, VL Angelim
Construction Management and Economics 32 (6), 575-594, 2014
562014
Float types in linear schedule analysis with singularity functions
G Lucko, AA Peña Orozco
Journal of Construction Engineering and Management 135 (5), 368-377, 2009
522009
Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing
G Lucko
Journal of Construction Engineering and Management 137 (7), 523-535, 2010
442010
A statistical analysis and model of the residual value of different types of heavy construction equipment
G Lucko
Virginia Tech, 2003
442003
Quantitative research: Preparation of incongruous economic data sets for archival data analysis
G Lucko, ZW Mitchell Jr
Journal of Construction Engineering and Management 136 (1), 49-57, 2009
402009
Statistical considerations for predicting residual value of heavy equipment
G Lucko, CM Anderson-Cook, MC Vorster
Journal of construction engineering and management 132 (7), 723-732, 2006
392006
Construction technology needs assessment update
MC Vorster, G Lucko
Construction Industry Institute, 173-11, 2002
292002
Harnessing the power of simulation in the project management/decision support aspects of the construction industry
G Lucko, PC Benjamin, MG Madden
2008 Winter Simulation Conference, 2479-2487, 2008
282008
Unknown element of owning costs—Impact of residual value
G Lucko, MC Vorster, CM Anderson-Cook
Journal of construction engineering and management 133 (1), 3-9, 2007
282007
Flexible modeling of linear schedules for integrated mathematical analysis
G Lucko
Proceedings of the 39th conference on Winter simulation: 40 years! The best …, 2007
272007
Comparison and renaissance of classic line-of-balance and linear schedule concepts for construction industry
Y Su, G Lucko
Procedia Engineering 123, 546-556, 2015
252015
Modeling the residual market value of construction equipment under changed economic conditions
G Lucko
Journal of construction engineering and management 137 (10), 806-816, 2010
252010
Construction spatial modeling and scheduling with three-dimensional singularity functions
G Lucko, HMM Said, A Bouferguene
Automation in Construction 43, 132-143, 2014
242014
Algorithm for time-cost tradeoff analysis in construction projects by aggregating activity-level singularity functions
SB Terry, G Lucko
Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012
232012
The system can't perform the operation now. Try again later.
Articles 1–20