Follow
Xiaochun Luo
Xiaochun Luo
Professor of Construction Informatics, South China University of Technology
Verified email at scut.edu.cn - Homepage
Title
Cited by
Cited by
Year
Automatic Pixel‐Level Crack Detection and Measurement Using Fully Convolutional Network
X Yang, H Li, Y Yu, X Luo, T Huang, X Yang
Computer‐Aided Civil and Infrastructure Engineering, 2018
6282018
Detecting non-hardhat-use by a deep learning method from far-field surveillance videos
Q Fang, H Li, X Luo, L Ding, H Luo, TM Rose, W An
Automation in construction 85, 1-9, 2018
4682018
Integration of BIM and GIS in sustainable built environment: A review and bibliometric analysis
H Wang, Y Pan, X Luo
Automation in construction 103, 41-52, 2019
2932019
Recognizing Diverse Construction Activities in Site Images via Relevance Networks of Construction-Related Objects Detected by Convolutional Neural Networks
X Luo, H Li, D Cao, F Dai, JO Seo, SH Lee
Journal of Computing in Civil Engineering 32 (3), 04018012, 2018
1682018
A deep learning-based method for detecting non-certified work on construction sites
Q Fang, H Li, X Luo, L Ding, TM Rose, W An, Y Yu
Advanced Engineering Informatics 35, 56-68, 2018
1502018
An automatic and non-invasive physical fatigue assessment method for construction workers
Y Yu, H Li, X Yang, L Kong, X Luo, AYL Wong
Automation in construction 103, 1-12, 2019
1472019
Toward low-carbon construction processes: the visualisation of predicted emission via virtual prototyping technology
JKW Wong, H Li, H Wang, T Huang, E Luo, V Li
Automation in Construction 33, 72-78, 2013
1402013
Towards efficient and objective work sampling: Recognizing workers' activities in site surveillance videos with two-stream convolutional networks
X Luo, H Li, D Cao, Y Yu, X Yang, T Huang
Automation in Construction 94 (2018), 360-370, 2018
1372018
Computer vision aided inspection on falling prevention measures for steeplejacks in an aerial environment
Q Fang, H Li, X Luo, L Ding, H Luo, C Li
Automation in Construction 93, 148-164, 2018
1312018
Capturing and Understanding Workers’ Activities in Far‐Field Surveillance Videos with Deep Action Recognition and Bayesian Nonparametric Learning
X Luo, H Li, X Yang, Y Yu, D Cao
Computer-Aided Civil and Infrastructure Engineering 34 (4), 333-351, 2019
1062019
Pre-service fatigue screening for construction workers through wearable EEG-based signal spectral analysis
H Li, D Wang, J Chen, X Luo, J Li, X Xing
Automation in Construction 106, 102851, 2019
752019
Vision-based detection and visualization of dynamic workspaces
X Luo, H Li, H Wang, Z Wu, F Dai, D Cao
Automation in Construction 104, 1-13, 2019
752019
Relationship network structure and organizational competitiveness: Evidence from BIM implementation practices in the construction industry
D Cao, H Li, G Wang, X Luo, D Tan
Journal of management in engineering 34 (3), 04018005, 2018
742018
Developing a green building evaluation standard for interior decoration: A case study of China
Z Wu, H Li, Y Feng, X Luo, Q Chen
Building and Environment 152, 50-58, 2019
732019
Investigation of the causality patterns of non-helmet use behavior of construction workers
H Li, X Li, X Luo, J Siebert
Automation in Construction 80, 95-103, 2017
732017
Dynamics of project-based collaborative networks for BIM implementation: Analysis based on stochastic actor-oriented models
D Cao, H Li, G Wang, X Luo, X Yang, D Tan
Journal of Management in Engineering 33 (3), 04016055, 2017
732017
Joint-Level Vision-Based Ergonomic Assessment Tool for Construction Workers, Journal of Construction Engineering and Management
Y Yu, X Yang, H Li, X Luo, H Guo, Q Fang
Journal of Construction Engineering and Management 145 (5), 04019025, 2019
692019
Chirp-spread-spectrum-based real time location system for construction safety management: A case study
H Li, G Chan, T Huang, M Skitmore, TYE Tao, E Luo, J Chung, XS Chan, ...
Automation in construction 55, 58-65, 2015
692015
Physical exertion modeling for construction tasks using combined cardiorespiratory and thermoregulatory measures
W Umer, H Li, Y Yantao, MF Antwi-Afari, S Anwer, X Luo
Automation in Construction 112, 103079, 2020
622020
Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates
L Kong, H Li, H Luo, L Ding, X Luo, M Skitmore
Automation in Construction 81, 34-43, 2017
612017
The system can't perform the operation now. Try again later.
Articles 1–20