Follow
Pablo Echevarria
Pablo Echevarria
Verified email at helmholtz-berlin.de
Title
Cited by
Cited by
Year
Status Report of the Berlin Energy Recovery Linac Project BERLinPro
M Abo-Bakr, W Anders, Y Bergmann, KB Bürkmann-Gehrlein, AB Büchel, ...
9th International Particle Accelerator Conference, 4127-4130, 2018
302018
Status Report of the Berlin Energy Recovery Linac Project BERLinPro
M Abo-Bakr, B Hall, J Kühn, R Müller, N Ohm, A Büchel, J Rahn, ...
302016
Digital hardware implementation of high dimensional fuzzy systems
P Echevarria, MV Martínez, J Echanobe, I del Campo, JM Tarela
Applications of Fuzzy Sets Theory: 7th International Workshop on Fuzzy Logic …, 2007
292007
The bERLinPro SRF photoinjector system-from first RF commissioning to first beam
A Neumann, D Böhlick, M Bürger, P Echevarria, A Frahm, HW Glock, ...
9th Int. Particle Accelerator Conf.(IPAC’18), Vancouver, Canada, 2018
202018
ESS-Bilbao light-ion linear accelerator and neutron source: design and applications
E Abad, I Arredondo, I Badillo, D Belver, FJ Bermejo, I Bustinduy, D Cano, ...
Journal of Physics: Conference Series 325 (1), 012003, 2011
152011
Progress Report of the Berlin Energy Recovery Project bERLinPro
M Abo-Bakr, W Anders, A Burrill, A Büchel, K Bürkmann-Gehrlein, ...
TUPWA018, Proc. of IPAC 15, 2015
92015
Status of the Berlin Energy Recovery Linac Project bERLinPro
M Abo-Bakr, W Anders, K Bürkmann-Gehrlein, A Büchel, P Echevarria, ...
8th Int. Particle Accelerator Conf.(IPAC'17), Copenhagen, Denmark, 14â 19 …, 2017
82017
Detuning compensation in SC cavities using Kalman filters
A Ushakov, P Echevarria, A Neumann
8th Int. Particle Accelerator Conf.(IPAC’17), Copenhagen, Denmark, 2017
82017
First LLRF tests of BERLinPro gun cavity prototype
P Echevarria, J Knobloch, O Kugeler, A Neumann, K Przygoda, ...
Proc. IPAC’16, 1831-1834, 2016
82016
A configurable electronics system for the ESS-Bilbao beam position monitors
L Muguira, D Belver, V Etxebarria, S Varnasseri, I Arredondo, ...
Nuclear Instruments and Methods in Physics Research Section A: Accelerators …, 2013
82013
The Berlin Energy Recovery Linac Project BERLinPro-Status, Plans and Future Opportunities
M Abo-Bakr, N Al-Saokal, W Anders, Y Bergmann, K Bürkmann-Gehrlein, ...
63th ICFA Advanced Beam Dynamics Workshop on Energy Recovery Linacs (ERL'19 …, 2020
62020
Setup and Status of an SRF Photoinjector for Energy-Recovery Linac Applications
T Kamps, D Böhlick, A Büchel, M Bürger, P Echevarria, A Frahm, F Göbel, ...
8th Int. Particle Accelerator Conf.(IPAC’17), Copenhagen, Denmark, 2017
62017
Superconducting radio-frequency virtual cavity for control algorithms debugging
P Echevarria, E Aldekoa, J Jugo, A Neumann, A Ushakov, J Knobloch
Review of Scientific Instruments 89 (8), 2018
52018
Developing Kalman Filter Based Detuning Control with a Digital SRF CW Cavity Simulator
A Ushakov, P Echevarria, A Neumann
IPAC 2018, 2018
52018
First Commissioning of an SRF Photo-Injector Module for bERLinPro
A Neumann, D Boehlick, A Buechel, M Buerger, A Burrill, P Echevarria, ...
Proc. the 8th Int. Particle Accelerator Conf.(IPAC’17), 971-974, 2017
52017
Overview of the BPM system of the ESS-Bilbao
D Belver, I Arredondo, M Del Campo, P Echevarria, J Feuchtwanger, ...
MOPD21, Proceedings DIPAC 11, 89-91, 2011
52011
Simulation of quench detection algorithms for Helmholtz Zentrum Berlin SRF cavities
P Echevarria, BG Arruabarrena, A Ushakov, J Jugo, A Neumann
Journal of Physics: Conference Series 1350 (1), 012187, 2019
42019
Final Acceptance Test of the SRF Photo-Injector Cold String for the bERLinPro Energy Recovery Linac
A Neumann, D Böhlick, P Echevarria, A Frahm, F Göbel, T Kamps, ...
28th Int. Linear Accelerator Conf.(LINAC’16), East Lansing, Michigan, USA, 2016
42016
RF FEEDBACK AND DETUNING STUDIES FOR THE BESSY VARIABLE PULSE LENGTH STORAGE RING HIGHER HARMONIC SC CAVITIES
A Neumann, P Echevarria, P Goslawski, M Ries, M Ruprecht, A Vélez, ...
42015
A MICROWAVE ION SOURCE FOR PULSED PROTON BEAM PRODUCTION AT ESS-BILBAO
R Miracoli, I Arredondo, D Belver, I Bustinduy, J Corres, P Echevarria, ...
ii Preface, 75, 2014
42014
The system can't perform the operation now. Try again later.
Articles 1–20