Follow
Cynthia C.Y. Tsao
Cynthia C.Y. Tsao
Owner, Navilean; Senior Associate, Lean Project Consulting; Adjunct Faculty, Wentworth Institute of
Verified email at navilean.com
Title
Cited by
Cited by
Year
Work structuring to achieve integrated product–process design
CCY Tsao, ID Tommelein, ES Swanlund, GA Howell
Journal of construction engineering and management 130 (6), 780-789, 2004
1142004
Case study for work structuring: installation of metal door frames
CCY Tsao, ID Tommelein, E Swanlund, GA Howell
Proc. Eighth Annual Conference of the International Group for Lean …, 2000
862000
Lean construction–2000 to 2006
T da CL Alves, CCY Tsao
Lean construction journal, 46, 2007
802007
Use of work structuring to increase performance of project-based production systems
CCY Tsao
University of California, Berkeley, 2005
322005
Driving Continuous Improvement by Developing and Leveraging Lean Key Performance Indicators
F España, CCY Tsao, M Hauser
272012
An overview, analysis, and facilitation tips for simulations that support and simulate pull planning
CC Tsao, J Draper, GA Howell
22nd Annual Conference of the International Group for Lean Construction …, 2014
252014
Teaching Lean Construction – Perspectives on Theory and Practice
CCY Tsao, M Azambuja, FR Hamzeh, C Menches, ZK Rybkowski
212013
Different perspectives on teaching lean construction
C Tsao, T Alves, P Mitropoulos
Proc. IGLC 20, 2012
182012
Integrated product-process development by a light fixture manufacturer
C Tsao, I Tommelein
Proceedings of the 2001 Annual Conference of the International Group for …, 2001
182001
Framework linking lean simulations to their applications on construction projects
A Neeraj, ZK Rybkowski, JL Fernández-Solís, RC Hill, C Tsao, B Seed, ...
24th annual conference of the international group for lean construction, 2016
162016
The evolution of lean construction education (Part 1 of 2): At US-based universities
Z Rybkowski, L Forbes, C Tsao
26th Annual Conference of the International Group for Lean Construction …, 2018
142018
The evolution of Lean Construction education at US-based universities
ZK Rybkowski, LH Forbes, CCY Tsao
Lean construction, 387-407, 2020
132020
The evolution of lean construction education (Part 2 of 2): At US-based companies
L Forbes, Z Rybkowski, C Tsao
26th Annual Conference of the International Group for Lean Construction …, 2018
92018
Learning to see simplicity within a complex project through the lens of Pull Planning
CCY Tsao, GJ Hammons
Proceedings of the 22nd Annual Conference of the International Group for …, 2014
72014
Impact of gender bias on career development &work engagement in the OAEC industry & lean practice
P Arroyo, A Schöttle, R Christensen, T Alves, DB Costa, K Parrish, C Tsao
Proc., 26th Annual Conf. of the Int. Group for Lean Construction, IGLC, 442-451, 2018
62018
12 Meeting Facilitation Techniques to Improve Healthcare Design Development
CCY Tsao, B Beikmann
62012
Creating work structuring transparency in curtain wall design
CCY Tsao, ID Tommelein
Proceedings 12th Annual Conference of the International Group for Lean …, 2004
62004
Comparing and implementing alternative work structures: installation of door frames
CCY Tsao, ID Tommelein
CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION 10, 2002
62002
‘Use of Design Drivers, Process Mapping, and DSM to Improve Integration within an Introductory BIM Course
L Xu, CCY Tsao
Proc., 20th Annual Conf. IGLC, International Group for Lean Construction, 2012
32012
The Evolution of Lean Construction Education at US-based Companies
LH Forbes, ZK Rybkowski, CCY Tsao
Lean Construction Journal, 182-193, 2021
22021
The system can't perform the operation now. Try again later.
Articles 1–20