Fouad Riane
Fouad Riane
Laboratoire Génie Industriel - CentraleSupelec - Ecole Centrale Casablanca
Verified email at centrale-casablanca.ma
Title
Cited by
Cited by
Year
Scheduling an operating theatre under human resource constraints
B Roland, C Di Martinelly, F Riane, Y Pochet
Computers & Industrial Engineering 58 (2), 212-220, 2010
1832010
A hybrid three-stage flowshop problem: efficient heuristics to minimize makespan
F Riane, A Artiba, SE Elmaghraby
European Journal of Operational Research 109 (2), 321-329, 1998
1351998
The inventory-routing problem of returnable transport items with time windows and simultaneous pickup and delivery in closed-loop supply chains
G Iassinovskaia, S Limbourg, F Riane
International Journal of Production Economics 183, 570-582, 2017
1102017
Exact and heuristic methods for the selective maintenance problem
T Lust, O Roux, F Riane
European journal of operational research 197 (3), 1166-1177, 2009
992009
An integrated production planning and scheduling system for hybrid flowshop organizations
F Riane, A Artiba, S Iassinovski
International Journal of Production Economics 74 (1-3), 33-48, 2001
752001
Operating theatre optimization: A resource-constrained based solving approach
B Roland, C Di Martinelly, F Riane
2006 International conference on service systems and service management 1 …, 2006
662006
A Porter-SCOR modelling approach for the hospital supply chain
C Di Martinelly, F Riane, A Guinet
International Journal of Logistics Systems and Management 5 (3-4), 436-456, 2009
542009
Scheduling of a two-machine flowshop with availability constraints on the first machine
H Allaoui, A Artiba, SE Elmaghraby, F Riane
International Journal of Production Economics 99 (1-2), 16-27, 2006
512006
Integration of simulation and optimization for solving complex decision making problems
S Iassinovski, A Artiba, V Bachelet, F Riane
International Journal of Production Economics 85 (1), 3-10, 2003
472003
Sequencing a hybrid two-stage flowshop with dedicated machines
F Riane, A Artiba, SE Elmaghraby
International Journal of Production Research 40 (17), 4353-4380, 2002
472002
A simulation based approach for supply network control
F Pirard, S Iassinovski, F Riane
International journal of production research 49 (24), 7205-7226, 2011
412011
An application of a planning and scheduling multi-model approach in the chemical industry
A Artiba, F Riane
Computers in Industry 36 (3), 209-229, 1998
371998
Scheduling hybrid flowshops: algorithms and applications
F Riane
Sciences, 1998
361998
How stochasticity and emergencies disrupt the surgical schedule
JS Tancrez, B Roland, JP Cordier, F Riane
Intelligent patient management, 221-239, 2009
292009
Assessing the impact of stochasticity for operating theater sizing
JS Tancrez, B Roland, JP Cordier, F Riane
Decision Support Systems 55 (2), 616-628, 2013
272013
To maintain or not to maintain? What should a risk‐averse decision maker do?
D Bardey, F Riane, A Artiba, L Eeckhoudt
Journal of Quality in Maintenance Engineering, 2005
232005
Chaîne logistique en milieu hospitalier: modélisation des processus de distribution de la pharmacie
C Di Martinelly, A Guinet, F Riane
6e Congrès international de génie industriel, 1-8, 2005
192005
Identification of reliability models for non repairable and repairable systems with small samples
O Basile, P Dehombreux, F Riane
Proceedings of IMS2004 Conference on Advances in maintenance and modeling …, 2004
172004
Integrating surgeons' preferences in the operating theatre planning
B Roland, F Riane
European Journal of Industrial Engineering 5 (2), 232-250, 2011
142011
Simulation based approaches for maintenance strategies optimization
F Riane, O Roux, O Basile, P Dehombreux
Handbook of Maintenance Management and Engineering, 133-153, 2009
132009
The system can't perform the operation now. Try again later.
Articles 1–20