Youngjib Ham
Title
Cited by
Cited by
Year
Visual monitoring of civil infrastructure systems via camera-equipped Unmanned Aerial Vehicles (UAVs): a review of related works
Y Ham, KK Han, JJ Lin, M Golparvar-Fard
Visualization in Engineering 4 (1), 1-8, 2016
3172016
Mapping actual thermal properties to building elements in gbXML-based BIM for reliable building energy performance modeling
Y Ham, M Golparvar-Fard
Automation in Construction 49, 214-224, 2015
1482015
An automated vision-based method for rapid 3D energy performance modeling of existing buildings using thermal and digital imagery
Y Ham, M Golparvar-Fard
Advanced Engineering Informatics 27 (3), 395-409, 2013
952013
EPAR: Energy Performance Augmented Reality models for identification of building energy performance deviations between actual measurements and simulation results
Y Ham, M Golparvar-Fard
Energy and Buildings 63, 15-28, 2013
842013
3D as-is building energy modeling and diagnostics: A review of the state-of-the-art
YK Cho, Y Ham, M Golpavar-Fard
Advanced Engineering Informatics 29 (2), 184-195, 2015
632015
Analyzing context and productivity of tunnel earthmoving processes using imaging and simulation
H Kim, S Bang, H Jeong, Y Ham, H Kim
Automation in Construction 92, 188-198, 2018
512018
Construction policymaking: With an example of singaporean government’s policy to diffuse prefabrication to private sector
M Park, Y Ingawale-Verma, W Kim, Y Ham
KSCE Journal of Civil Engineering 15 (5), 771-779, 2011
452011
3D Visualization of thermal resistance and condensation problems using infrared thermography for building energy diagnostics
Y Ham, M Golparvar-Fard
Visualization in Engineering 2 (1), 1-15, 2014
422014
Automated diagnostics and visualization of potential energy performance problems in existing buildings using energy performance augmented reality models
M Golparvar-Fard, Y Ham
Journal of Computing in Civil Engineering 28 (1), 17-29, 2014
412014
Rapid 3D energy performance modeling of existing buildings using thermal and digital imagery
Y Ham, M Golparvar-Fard
Construction Research Congress 2012@ sConstruction Challenges in a Flat …, 2012
252012
Systematic camera placement framework for operation-level visual monitoring on construction jobsites
J Kim, Y Ham, Y Chung, S Chi
Journal of Construction Engineering and Management 145 (4), 04019019, 2019
242019
Three-dimensional thermography-based method for cost-benefit analysis of energy efficiency building envelope retrofits
Y Ham, M Golparvar-Fard
Journal of Computing in Civil Engineering 29 (4), B4014009, 2015
232015
Automated content-based filtering for enhanced vision-based documentation in construction toward exploiting big visual data from drones
Y Ham, M Kamari
Automation in Construction 105, 102831, 2019
222019
Participatory sensing and digital twin city: updating virtual city models for enhanced risk-informed decision-making
Y Ham, J Kim
Journal of Management in Engineering 36 (3), 04020005, 2020
192020
Quantifying the impact of building envelope condition on energy use
J Jeon, J Lee, Y Ham
Building Research & Information 47 (4), 404-420, 2019
172019
Vision-based nonintrusive context documentation for earthmoving productivity simulation
H Kim, Y Ham, W Kim, S Park, H Kim
Automation in Construction 102, 135-147, 2019
152019
Visual monitoring of civil infrastructure systems via camera-equipped Unmanned Aerial Vehicles (UAVs): a review of related works, Vis. Eng. 4 (1)(2016) 1
Y Ham, KK Han, JJ Lin, M Golparvar-Fard
152016
Automated Cost Analysis of Energy Loss in Existing Buildings through Thermographic Inspections and CFD Analysis
Y Ham, M Golparvar-Fard
30th International Symposium on Automation and Robotics in Construction (ISARC), 2013
152013
Integrated visualization for reinforced concrete using ultrasonic tomography and image-based 3-D reconstruction
H Choi, Y Ham, JS Popovics
Construction and building materials 123, 384-393, 2016
142016
Development of design process management model using dependency structure matrix for constructability
MS Park, YJ Ham, HS Lee, WY Kim
Korean Journal of Construction Engineering and Management 11 (5), 65-74, 2010
112010
The system can't perform the operation now. Try again later.
Articles 1–20