עקוב אחר
Mehdi Ranjbar-Bourani
Mehdi Ranjbar-Bourani
University of Science and Technology of Mazandaran
כתובת אימייל מאומתת בדומיין mazust.ac.ir
כותרת
צוטט על ידי
צוטט על ידי
שנה
Improving the lifecycle performance of engineering projects with flexible strategies: example of on‐shore LNG production design
MA Cardin, M Ranjbar‐Bourani, R De Neufville
Systems Engineering 18 (3), 253-268, 2015
852015
Novel modifications of social engineering optimizer to solve a truck scheduling problem in a cross-docking system
AM Fathollahi-Fard, M Ranjbar-Bourani, N Cheikhrouhou, ...
Computers & Industrial Engineering 137, 106103, 2019
822019
A robust bi-objective mathematical model for disaster rescue units allocation and scheduling with learning effect
EB Tirkolaee, NS Aydın, M Ranjbar-Bourani, GW Weber
Computers & Industrial Engineering 149, 106790, 2020
622020
A cell formation problem considering machine utilization and alternative process routes by scatter search
R Tavakkoli-Moghaddam, M Ranjbar-Bourani, GR Amin, A Siadat
Journal of Intelligent Manufacturing 23 (4), 1127, 2012
592012
A Self-Learning Particle Swarm Optimization for Robust Multi-Echelon Capacitated Location-Allocation-Inventory Problem
EB Tirkolaee, J Mahmoodkhani, M Ranjbar-Bourani, ...
Journal of Advanced Manufacturing Systems, 2019
552019
Big data-driven cognitive computing system for optimization of social media analytics
AK Sangaiah, A Goli, EB Tirkolaee, M Ranjbar-Bourani, HM Pandey, ...
Ieee Access 8, 82215-82226, 2020
502020
Engineering options analysis (EOA): Applications
R de Neufville, K Smet, MA Cardin, M Ranjbar-Bourani
Decision making under deep uncertainty: From theory to practice, 223-252, 2019
402019
Solving a flexible job shop lot sizing problem with shared operations using a self-adaptive COA
H Abdollahzadeh Sangroudi, M Ranjbar-Bourani
International Journal of Production Research 59 (2), 483-515, 2021
152021
Quantifying the Value of Flexibility in Oil and Gas Projects: A Case Study of Centralized Vs. Decentralized LNG Production Systems
MA CARDIN, MR BOURANI, Y DENG, BER de NEUFVILLE
KOMtech Technology Review, 13, 2013
92013
A new multi-objective model for a cell formation problem considering machine utilization and alternative process routes (research note)
R Tavakkoli-Moghaddam, M Ranjbar-Bourani, H Mirzahosseinian, ...
International Journal of Engineering-Transactions A: Basics 22 (1), 21, 2008
7*2008
Two meta-heuristics to solve a coordinated air transportation and production scheduling problem with time windows for the due date
R Tavakkoli-Moghaddam, M Hajiaghaei-Keshteli, M Mousavi, ...
2016 IEEE international conference on systems, man, and cybernetics (SMC …, 2016
62016
Impact of transportation system on total cost in a two-echelon dual channel supply chain
H Mirzahosseinian, A Makui, E Teimoury, M Ranjbar-Bourani, ...
International Journal of Engineering, 2011
52011
A decision-making tool to design a flexible liquefied natural gas system under uncertainty
T Xia, MA Cardin, M Ranjbar-Bourani, MA Caunhye
2015 IEEE International Conference on Systems, Man, and Cybernetics, 789-794, 2015
42015
Applying Scatter Search Algorithm Based on TOPSIS to Multiobjective Cellular Manufacturing System Design
M Ranjbar-Bourani, R Tavakkoli-Moghaddam, H Amoozad-Khalili, ...
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH …, 2010
42010
A new dynamical behaviour modeling for a four-level supply chain: control and synchronization of hyperchaotic
SM Hamidzadeh, M Rezaei, M Ranjbar-Bourani
Journal of applied research on industrial engineering 9 (2), 288-301, 2022
32022
Dynamic opportunistic maintenance grouping in a lot streaming based job-shop scheduling problem
H Abdollahzadeh-Sangroudi, E Moazzam-Jazi, R Tavakkoli-Moghaddam, ...
Computers & Industrial Engineering 183, 109424, 2023
22023
Chaos synchronization for a class of uncertain chaotic supply chain and its control by ANFIS
SM Hamidzadeh, M Rezaei, M Ranjbar-Bourani
International Journal of Production Management and Engineering 11 (2), 113-126, 2023
22023
AN INTEGRATED MULTI-CRITERIA SCREENING FRAMEWORK TO ANALYZE FLEXIBILITY IN ENGINEERING SYSTEMS DESIGN: APPLICATIONS IN LNG INFRASTRUCTURES
M RANJBAR-BOURANI
22015
8.1. 2 Quantifying the Value of Flexibility in Design and Management of Onshore LNG Production System
MA Cardin, MR Bourani, Y Deng, R de Neufville, R Atapattu, X Sheng, ...
INCOSE International Symposium 24 (1), 775-792, 2014
22014
Fuzzy Demand Consideration in a Multi-Objective Dynamic Cell Formation Problem Using a Robust Scatter Search
H Amoozad-Khalili, M Ranjbar-Bourani, SMJM Ale-Hashem
2*
המערכת אינה יכולה לבצע את הפעולה כעת. נסה שוב מאוחר יותר.
מאמרים 1–20