Life cycle assessment based environmental impact estimation model for pre-stressed concrete beam bridge in the early design phase KJ Kim, WG Yun, N Cho, J Ha Environmental Impact Assessment Review 64, 47-56, 2017 | 34 | 2017 |
Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry V Aramali, H Sanboskani, GE Gibson Jr, M El Asmar, N Cho Journal of Management in Engineering 38 (3), 03122001, 2022 | 21 | 2022 |
Earned value management system state of practice: Identifying critical subprocesses, challenges, and environment factors of a high-performing EVMS V Aramali, GE Gibson Jr, M El Asmar, N Cho Journal of Management in Engineering 37 (4), 04021031, 2021 | 21 | 2021 |
Earned value management system (EVMS) reliability: A review of existing EVMS literature N Cho, M El Asmar, GE Gibson Jr, V Aramali Construction Research Congress 2020, 631-639, 2020 | 15 | 2020 |
An analysis of the characteristics of environmental impact for PSC beam bridges using life cycle assessment N Cho, WG Yun, WR Lee, KJ Kim KSCE Journal of Civil and Environmental Engineering Research 36 (2), 297-305, 2016 | 14 | 2016 |
Long-term performance benefits of the design-build delivery method applied to road pavement projects in the US N Cho, M El Asmar, S Underwood, Y Kamarianakis KSCE Journal of Civil Engineering 24 (4), 1049-1059, 2020 | 9 | 2020 |
Improvement for asset management of sewage treatment facilities HJ Park, MS An, NH Cho, KJ Kim KSCE Journal of Civil and Environmental Engineering Research 31 (2D), 285-293, 2011 | 8 | 2011 |
An analysis of the impact of the circular economy application on construction and demolition waste in the United States of America N Cho, M El Asmar, M Aldaaja Sustainability 14 (16), 10034, 2022 | 7 | 2022 |
Assessment model on environmental economics for construction projects in Korea SH Kwon, KJ Kim, K Kim, N Cho KSCE Journal of Civil Engineering 16, 505-516, 2012 | 7 | 2012 |
Investigating the circular economy as a solution for construction waste: challenges and opportunities L El Asmar, N Cho, M El Asmar Proceedings of the EURO MED SEC 2, 2018 | 6 | 2018 |
Evaluating the ride quality of asphalt concrete pavements delivered using Design-Build H Sanboskani, N Cho, ME Asmar, S Underwood Construction Research Congress 2018, 424-433, 2018 | 5 | 2018 |
A Study on Development of Level of Service (LoS) in Asset Management for Separated Sewer Pipe by Function Analysis Systems Technique SH Ha, S Kim, N Cho, KJ Kim KSCE Journal of Civil and Environmental Engineering Research 32 (2D), 147-157, 2012 | 5 | 2012 |
EVMS Maturity Assessment Tool Development Process: Integrated Project/Program Management (IP2M) Maturity and Environment Total Risk Rating (METRR) Using an Earned Value … V Aramali, GE Gibson Jr, M El Asmar, N Cho, H Sanboskani Report, 2022 | 3 | 2022 |
EVMS Environment Assessment Tool Development Process: Integrated Project/Program Management (IP2M) Maturity and Environment Total Risk Rating (METRR) Using an Earned Value … V Aramali, GE Gibson Jr, M El Asmar, N Cho, H Sanboskani Report, 2022 | 3 | 2022 |
Quantifying and benchmarking the project delivery performance of public-private-partnership (PPP) transportation projects in the US M El Asmar, DW Ramsey, N Cho College Park, MD: National Transportation Center at Maryland, 2017 | 3 | 2017 |
Glossary: Integrated Project/Program Management (IP2M) Maturity and Environment Total Risk Rating (METRR) using an Earned Value Management System (EVMS) G Gibson, M El Asmar, H Sanboskani, V Aramali, N Cho http://10.13140/RG.2.2.14087.88488, 2022 | 2* | 2022 |
Front End Planning for Industrial Projects: Identifying the Reasons behind Schedule and Cost Overruns Using the New PDRI MATRS N Cho, G Gibson, M El Asmar Construction Research Congress 2022, 883-891, 2022 | 1 | 2022 |
LCA 기반 PSC 교량의 환경부하 특성분석에 대한 연구 조남호, 윤원건, 이완렬, 김경주 대한토목학회논문집 36 (2), 297-305, 2016 | 1 | 2016 |
Practical issues in application of RFID to pipeline construction and its benefit analysis KC Yun, CD Oh, NH Cho, KJ Kim, CS Park Journal of construction engineering and project management 4 (2), 1-7, 2014 | 1 | 2014 |
Literature Review List: Integrated Project/Program Management (IP2M) Maturity and Environment Total Risk Rating (METRR) using an Earned Value Management System (EVMS) V Aramali, G Gibson, M El Asmar, H Sanboskani, N Cho http://10.13140/RG.2.2.30865.10085, 2022 | | 2022 |