Follow
Gino Dini
Gino Dini
Unknown affiliation
Verified email at ing.unipi.it
Title
Cited by
Cited by
Year
Automated sequencing and subassembly detection in assembly planning
G Dini, M Santochi
CIRP annals 41 (1), 1-4, 1992
3111992
Grasping devices and methods in automated production processes
G Fantoni, M Santochi, G Dini, K Tracht, B Scholz-Reiter, J Fleischer, ...
CIRP Annals 63 (2), 679-701, 2014
2542014
Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method
A Rossi, G Dini
Robotics and Computer-Integrated Manufacturing 23 (5), 503-516, 2007
2262007
Application of augmented reality techniques in through-life engineering services
G Dini, M Dalle Mura
Procedia Cirp 38, 14-23, 2015
1832015
Computer aided disassembly planning: state of the art and perspectives
M Santochi, G Dini, F Failli
CIRP Annals 51 (2), 507-529, 2002
1602002
Experimental approach to the laser machining of PMMA substrates for the fabrication of microfluidic devices
L Romoli, G Tantussi, G Dini
Optics and Lasers in Engineering 49 (3), 419-427, 2011
1572011
Generation of optimized assembly sequences using genetic algorithms
G Dini, F Failli, B Lazzerini, F Marcelloni
CIRP Annals 48 (1), 17-20, 1999
1391999
An integrated environment based on augmented reality and sensing device for manual assembly workstations
M Dalle Mura, G Dini, F Failli
Procedia Cirp 41, 340-345, 2016
1262016
Improving efficiency of industrial maintenance with context aware adaptive authoring in augmented reality
JA Erkoyuncu, IF del Amo, M Dalle Mura, R Roy, G Dini
Cirp Annals 66 (1), 465-468, 2017
1232017
EMOGA: A hybrid genetic algorithm with extremal optimization core for multiobjective disassembly line balancing
F Pistolesi, B Lazzerini, M Dalle Mura, G Dini
IEEE Transactions on Industrial Informatics 14 (3), 1089-1098, 2017
1192017
Designing assembly lines with humans and collaborative robots: A genetic approach
M Dalle Mura, G Dini
CIRP Annals 68 (1), 1-4, 2019
1102019
Grasping leather plies by Bernoulli grippers
G Dini, G Fantoni, F Failli
CIRP annals 58 (1), 21-24, 2009
1082009
Dynamic scheduling of FMS using a real-time genetic algorithm
A Rossi, G Dini
International Journal of Production Research 38 (1), 1-20, 2000
1052000
Laser beam welding of dissimilar stainless steels in a fillet joint configuration
MMA Khan, L Romoli, M Fiaschi, G Dini, F Sarri
Journal of Materials Processing Technology 212 (4), 856-867, 2012
1002012
Experimental design approach to the process parameter optimization for laser welding of martensitic stainless steels in a constrained overlap configuration
MMA Khan, L Romoli, M Fiaschi, G Dini, F Sarri
Optics & Laser Technology 43 (1), 158-172, 2011
892011
Computer aided planning of assembly operations: the selection of assembly sequences
M Santochi, G Dini
Robotics and Computer-Integrated Manufacturing 9 (6), 439-446, 1992
871992
Ant colony systems in assembly planning: a new approach to sequence detection and optimization
F Failli, G Dini
852000
KAPLAN: a knowledge-based approach to process planning of rotational parts
F Giusti, M Santochi, G Dini
CIRP Annals 38 (1), 481-484, 1989
741989
COATS: an expert module for optimal tool selection
F Giusti, M Santochi, G Dini
CIRP Annals 35 (1), 337-340, 1986
701986
A disassembly planning software system for the optimization of recycling processes
G Dini, F Failli, M Santochi
Production Planning & Control 12 (1), 2-12, 2001
642001
The system can't perform the operation now. Try again later.
Articles 1–20