Follow
Dr. Chao-Bo Yan
Title
Cited by
Cited by
Year
Production lead time in serial lines: Evaluation, analysis, and control
SM Meerkov, CB Yan
IEEE Transactions on Automation Science and Engineering 13 (2), 663-675, 2014
462014
Raw material release rates to ensure desired production lead time in Bernoulli serial lines
S Biller, SM Meerkov, CB Yan
International Journal of Production Research 51 (14), 4349-4364, 2013
312013
Efficient simulation method for general assembly systems with material handling based on aggregated event-scheduling
Y Zhao, CB Yan, Q Zhao, N Huang, J Li, X Guan
IEEE transactions on automation science and engineering 7 (4), 762-775, 2009
242009
Process monitoring, diagnosis and control of additive manufacturing
Q Fang, G Xiong, MC Zhou, TS Tamir, CB Yan, H Wu, Z Shen, FY Wang
IEEE Transactions on Automation Science and Engineering 21 (1), 1041-1067, 2022
222022
Problem formulation and solution methodology for energy consumption optimization in Bernoulli serial lines
CB Yan, Z Zheng
IEEE Transactions on Automation Science and Engineering 18 (2), 776-790, 2020
212020
Formulation and a simulation-based algorithm for line-side buffer assignment problem in systems of general assembly line with material handling
CB Yan, Q Zhao, N Huang, G Xiao, J Li
IEEE Transactions on Automation Science and Engineering 7 (4), 902-920, 2010
202010
An effective and efficient divide-and-conquer algorithm for energy consumption optimisation problem in long Bernoulli serial lines
CB Yan, Z Zheng
International Journal of Production Research 59 (23), 7018-7036, 2021
182021
Where am I parking: Incentive online parking-space sharing mechanism with privacy protection
D An, Q Yang, D Li, W Yu, W Zhao, CB Yan
IEEE Transactions on Automation Science and Engineering 19 (1), 143-162, 2020
182020
Robust energy management for a corporate energy system with shift-working V2G
S Dai, F Gao, X Guan, CB Yan, K Liu, J Dong, L Yang
IEEE Transactions on Automation Science and Engineering 18 (2), 650-667, 2020
182020
Equilibria, stability, and transients in re-entrant lines under FBFS and LBFS dispatch and constant release
CB Yan, M Hassoun, SM Meerkov
IEEE Transactions on Semiconductor Manufacturing 25 (2), 211-229, 2012
172012
A unified effective method for aggregating multi-machine stages in production systems
CB Yan, Q Zhao
IEEE Transactions on Automatic Control 58 (7), 1674-1687, 2013
162013
Bernoulli serial lines with batching machines: Performance analysis and system-theoretic properties
JQ Wang, FY Yan, PH Cui, CB Yan
IISE Transactions 51 (7), 729-743, 2019
152019
Analytical approach to estimate efficiency of series machines in production lines
CB Yan, Q Zhao
IEEE Transactions on Automation Science and Engineering 15 (3), 1027-1040, 2017
142017
Analysis and optimization of energy consumption in two-machine Bernoulli lines with general bounds on machine efficiency
CB Yan
IEEE Transactions on Automation Science and Engineering 18 (1), 151-163, 2020
132020
Formulation and solution methodology for reducing energy consumption in two-machine Bernoulli serial lines
CB Yan, X Cheng, F Gao, X Guan
IEEE Transactions on Automation Science and Engineering 19 (1), 522-530, 2020
122020
Cellular production lines with asymptotically reliable Bernoulli machines: Lead time analysis and control
SM Meerkov, CB Yan
IEEE Transactions on Automation Science and Engineering 12 (2), 764-768, 2014
122014
Energy consumption control in the two-machine Bernoulli serial production line with setup and idleness
Z Pei, P Yang, Y Wang, CB Yan
International Journal of Production Research 61 (9), 2917-2936, 2023
112023
A novel MOEA/D for multiobjective scheduling of flexible manufacturing systems
X Wang, K Xing, CB Yan, M Zhou
Complexity 2019, 2019
112019
A multi-timescale bilinear model for optimization and control of HVAC systems with consistency
Z Nie, F Gao, CB Yan
Energies 14 (2), 400, 2021
102021
Deadlock Prevention Controller for Automated Manufacturing Systems Modeled by S4PR
Y Feng, M Zhou, F Tian, CB Yan, K Xing
IEEE Transactions on Systems, Man, and Cybernetics: Systems 51 (12), 7403-7412, 2020
102020
The system can't perform the operation now. Try again later.
Articles 1–20