Abdelhakim Artiba
Abdelhakim Artiba
Université Polytechnique Hauts-de-France
Verified email at uphf.fr
Title
Cited by
Cited by
Year
Manufacturing execution system–a literature review
B Saenz de Ugarte, A Artiba, R Pellerin
Production planning and control 20 (6), 525-539, 2009
2412009
Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
H Allaoui, A Artiba
Computers & Industrial Engineering 47 (4), 431-450, 2004
2342004
Solving surgical cases assignment problem by a branch-and-price approach
H Fei, C Chu, N Meskens, A Artiba
International journal of production economics 112 (1), 96-108, 2008
1842008
A hybrid three-stage flowshop problem: efficient heuristics to minimize makespan
F Riane, A Artiba, SE Elmaghraby
European Journal of Operational Research 109 (2), 321-329, 1998
1351998
Scheduling two-stage hybrid flow shop with availability constraints
H Allaoui, A Artiba
Computers & Operations Research 33 (5), 1399-1419, 2006
1332006
Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan
H Allaoui, S Lamouri, A Artiba, E Aghezzaf
International Journal of Production Economics 112 (1), 161-167, 2008
862008
The planning and scheduling of production systems: methodologies and applications
A Artiba, SE Elmaghraby
Springer Science & Business Media, 1996
831996
An integrated production planning and scheduling system for hybrid flowshop organizations
F Riane, A Artiba, S Iassinovski
International Journal of Production Economics 74 (1-3), 33-48, 2001
752001
Introduction to intelligent simulation: The RAO language
A Artiba, VV Emelyanov, SI Iassinovski
Springer Science & Business Media, 2012
592012
Scheduling of a two-machine flowshop with availability constraints on the first machine
H Allaoui, A Artiba, SE Elmaghraby, F Riane
International Journal of Production Economics 99 (1-2), 16-27, 2006
512006
Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
R Benmansour, H Allaoui, A Artiba, S Hanafi
Computers & Operations Research 47, 106-113, 2014
482014
Integration of simulation and optimization for solving complex decision making problems
S Iassinovski, A Artiba, V Bachelet, F Riane
International Journal of Production Economics 85 (1), 3-10, 2003
472003
Sequencing a hybrid two-stage flowshop with dedicated machines
F Riane, A Artiba, SE Elmaghraby
International Journal of Production Research 40 (17), 4353-4380, 2002
472002
A generic framework to support the selection of an RFID-based control system with application to the MRO activities of an aircraft engine manufacturer
A Ramudhin, M Paquet, A Artiba, P Dupré, D Varvaro, V Thomson
Production Planning and Control 19 (2), 183-196, 2008
452008
A scheduling problem in glass manufacturing
DW He, A Kusiak, A Artiba
IIE transactions 28 (2), 129-139, 1996
431996
An application of a planning and scheduling multi-model approach in the chemical industry
A Artiba, F Riane
Computers in Industry 36 (3), 209-229, 1998
371998
Hybrid flowshop problems, a decomposition based heuristic approach
EH Aghezzaf, A Artiba, O Moursli, C Tahon
Proceedings of the international conference on industrial engineering and …, 1995
301995
Joint optimal periodic and conditional maintenance strategy
MA Jamali, D Ait‐Kadi, R Cleroux, A Artiba
Journal of Quality in Maintenance Engineering, 2005
282005
Integrating simulation and optimization of manufacturing systems
D Duvivier, V Dhaevers, V Bachelet, A Artiba
IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and …, 2003
282003
An architecture of a multi-model system for planning and scheduling
A Artiba, EH Aghezzaf
International Journal of Computer Integrated Manufacturing 10 (5), 380-393, 1997
271997
The system can't perform the operation now. Try again later.
Articles 1–20