עקוב אחר
Ron Wakefield
Ron Wakefield
Professor of Construction, RMIT University
כתובת אימייל מאומתת בדומיין rmit.edu.au
כותרת
צוטט על ידי
צוטט על ידי
שנה
Drivers, constraints and the future of offsite manufacture in Australia
N Blismas, R Wakefield
Construction innovation 9 (1), 72-83, 2009
4992009
Public and private blockchain in construction business process and information integration
R Yang, R Wakefield, S Lyu, S Jayasuriya, F Han, X Yi, X Yang, ...
Automation in construction 118, 103276, 2020
4132020
Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction
M Arashpour, R Wakefield, EWM Lee, R Chan, MR Hosseini
International Journal of Project Management 34 (7), 1393-1402, 2016
1332016
Off-site construction optimization: Sequencing multiple job classes with time constraints
M Arashpour, R Wakefield, B Abbasi, EWM Lee, J Minas
Automation in construction 71, 262-270, 2016
1282016
Optimization of process integration and multi-skilled resource utilization in off-site construction
M Arashpour, R Wakefield, N Blismas, J Minas
Automation in Construction 50, 72-80, 2015
1262015
Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction
M Arashpour, V Kamat, Y Bai, R Wakefield, B Abbasi
Automation in Construction 95, 1-9, 2018
1212018
Design and development of distributed solar PV systems: Do the current tools work?
WMPU Wijeratne, RJ Yang, E Too, R Wakefield
Sustainable cities and society 45, 553-578, 2019
1172019
The development and testing of a hierarchical measure of project OHS performance
H Lingard, R Wakefield, P Cashin
Engineering, Construction and Architectural Management 18 (1), 30-49, 2011
1142011
Towards a new development model for housing regeneration in greyfield precincts
P Newton, S Murray, R Wakefield, C Murphy, LA Khor, T Morgan
Australian Housing and Urban Research Institute, 2011
992011
Analysis of seismic failure in skew RC bridge
RR Wakefield, AS Nazmy, DP Billington
Journal of Structural Engineering 117 (3), 972-986, 1991
961991
Petri nets for simulation and modeling of construction systems
RR Wakefield, GA Sears
Journal of construction engineering and management 123 (2), 105-112, 1997
911997
Concrete prefabricated housing via advances in systems technologies: Development of a technology roadmap
N Blismas, R Wakefield, B Hauser
Engineering, Construction and Architectural Management 17 (1), 99-110, 2010
902010
Factors influencing food choice by the seaweed-eating marine snail Norrisianorrisi (Trochidae)
RL Wakefield, SN Murray
Marine Biology 130, 631-642, 1998
881998
Autonomous production tracking for augmenting output in off-site construction
M Arashpour, R Wakefield, N Blismas, T Maqsood
Automation in construction 53, 13-21, 2015
832015
Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources
M Arashpour, R Wakefield, B Abbasi, M Arashpour, R Hosseini
Architectural Engineering and Design Management 14 (1-2), 46-59, 2018
812018
Analysis of disruptions caused by construction field rework on productivity in residential projects
M Arashpour, R Wakefield, N Blismas, EWM Lee
Journal of construction engineering and management 140 (2), 04013053, 2014
762014
Industrializing the Residental Construction Site
M O'Brien, R Wakefield, Y Béliveau
732000
Exploring the link between early constructor involvement in project decision-making and the efficacy of health and safety risk control
H Lingard, P Pirzadeh, N Blismas, R Wakefield, B Kleiner
Construction management and economics 32 (9), 918-931, 2014
682014
The effect of early supplier engagement on social sustainability outcomes in project-based supply chains
LW Saunders, BM Kleiner, AP McCoy, H Lingard, T Mills, N Blismas, ...
Journal of Purchasing and Supply Management 21 (4), 285-295, 2015
622015
Australian suburban house building: industry organisation, practices and constraints-Final Report No. 213
T Dalton, J Hurley, E Gharaie, R Wakefield, R Horne
AHURI Final Report Series, 1-78, 2013
52*2013
המערכת אינה יכולה לבצע את הפעולה כעת. נסה שוב מאוחר יותר.
מאמרים 1–20